|

P.O.
Box 1881
Port
Angeles, WA
USA
_______________
contact
us
****
(360)
457-0855
*****
Site
Menu
Drawing
Services Home
Downloads
Sections:
Pricing
and Order
Links
Comments
| |
Custom Cabinet Builder:
The following information will be needed for all drawing types (2D and 3D):
- Download the Checklist.
- A floor plan with cabinets identified either with the manufactures nomenclatures
or cabinet number and a key. This can be hand sketched as long as
overall dimensions are given and the cabinet nomenclature (or key) include
size information (ig B24). Special cabinets will need individual
sketches.
- If there is anything other than plain cabinets I will need elevation views
with the specifics identified. Hand sketched is ok as long as the
information is complete.
- The more information I have the better the drawing will be, even photographs
of the room can supply information.
- I will need a list of the drawings required:
- Floor plan with nomenclatures
- Floor plan with consumer text
- Elevations 1 for each wall, 2 for a peninsula, 2-4 for an island.
- 3D views showing what detail or just overall.
- Which drawings if any require a border - borders are the frame around a
drawing that includes information on the drawing such as job name, clients,
date, etc.
- Reports
- Do you want a:
- cabinet list
- door list
- part list
- cutting list
- labels
- optimized panel cutting
- What format:
- ASCII text file
- MS Excel
- MS Word.
- Acrobat Reader
- Printed and mailed
- I need information on how you build your cabinets to make this work.
Please download and fill out the questionnaires.
- Drawing Details - what
the drawings will use to match your construction.
- Nomenclatures - Cabinet
IDs such as 'B' for base, these nomenclatures are for the auto created
nomenclatures. You can also use mine and save the time and expense
of customizing, or tell me what the complete nomenclature is for each
cabinet.
- Part-Listing - These are the
construction values that allows a parts list to be created.
Drawing and part-listing questionnaires are required to make any
part-list based report.
|